KEEP PERFECT BAGSCUSTOM BAG PROGRAMMES BY QUANZHOU JUNYUAN BAGS Get a quote

What Are the 25 Points to Verify Before a Reorder Ships?

Twenty-five checks in five groups fit on one sheet and cover everything a reorder can get wrong: documents, materials, measurements, construction, and packing with evidence. This article gives the list group by group, says what a fail means on each, and shows how the completed sheet is filed against the style.

Reorder checklist sheet on a clipboard
The checklist: five groups, twenty-five lines, a pass or fail column and a signature line.
Quick answer

['MOQ 500 pcs per style and colourway; 300 pcs open to discussion on a repeat.', 'Sampling 6-10 working days from a signed-off tech pack.', 'Bulk production 35-50 days from written sample approval.', 'Inspection at AQL 2.5, ISO 2859-1, General Inspection Level II.', 'T/T 30/70, FOB Xiamen; CIF and DDP available.', 'Twenty-five checks in five groups, on one sheet, before the cartons are sealed.', 'A checklist is applied at inspection, not written afterwards from memory.']

A checklist is not a quality system, and it is worth saying so before listing anything. It is a memory aid for the one moment that matters - the hour before the cartons are sealed, when somebody has to decide whether this lot is the same as the last one and has about twenty minutes in which to decide it.

What makes a checklist useful is that it is finite, grouped and applied at the same point, in the same order, on every run. Twenty-five lines in five groups fit on one sheet, take an hour, and cover the failure modes that actually occur on a repeat rather than the ones that sound impressive. A list that nobody completes is worse than no list, because it produces a sheet that reads as assurance.

Put a header on the sheet with the style, colourway, revision, run number, lot size, sample size and date. Six fields, and they are what let the sheet be found and read a year later without anyone having to work out which run it belonged to.

How Is the Checklist Organised?

Five groups of five: documents, materials, measurements, construction, and packing with evidence. The grouping matters because a reader who finds a fail in the materials group knows where to look next, and because five groups are easier to complete than twenty-five unrelated lines.

Each line carries a pass or fail column and, where the line is measured, a reading column. A checklist with only ticks is a checklist that cannot be reviewed later, because it records a conclusion and not the evidence behind it. Where a line is measured, the reading is the point of the line and the tick is only the summary of it.

The list is written for a repeat rather than for a first order, which is why it contains no drawing checks and no development questions. On a first order most of these lines do not exist yet, and the checklist that replaces them asks entirely different questions.

What Are the Five Document Checks?

The revision cited on the order matches the revision in force. The component register is current. The change log has an entry for every material or trim difference. The retained reference is the one for this revision. And the previous comparison sheet is to hand.

Those five are the least costly on the sheet and the most often skipped, because none of them requires touching the goods. They are also the five that decide whether anything found later can be interpreted, so they come first.

The five groups of the checklist, and what a fail in each one means
GroupFive linesWhat a fail in this group means
DocumentsRevision cited, register current, log complete, reference correct, previous sheet to handNothing found later can be interpreted
MaterialsBody fabric, lining, padding, webbing and thread, fasteners and hardwareA substitution has occurred
MeasurementsDimensions, mass, foam thickness, stitch density, artwork positionThe product has moved from the approved run
ConstructionSeam type, reinforced points, assembly sequence, handle attachment, closure functionThe bag is made differently
Packing and evidenceCarton and marking, folding and packing, labels, documents, retained unit takenThe shipment is not what was ordered

Materials are also the group where a fail is most likely to be a substitution rather than a defect. That matters because the response is different: a defect is sorted out of the lot, while a substitution has to go through the change log, which takes a decision by both owners rather than an hour with a sorting table.

What Are the Five Material Checks?

Body fabric against the retained panel. Lining against its reference. Padding or foam against the retained offcut and the certificate. Webbing and thread against their registered codes. Fasteners and hardware against the retained pieces.

Compare each of the five by the method written on the tolerance table rather than by eye alone: shade by instrument with a gray scale fallback, foam by thickness at named points, hardware by code and by a fit check in the mating part. A material check performed by eye is a material check that will pass a substitution.

Order the measurements so the quickest come first. Mass takes seconds and catches the widest range of problems, so it belongs at the top of the group, with the slower and more specific readings underneath it.

What Are the Five Measurement Checks?

Dimensions at the named points. Mass of the finished bag. Foam thickness where the style has padding. Stitch density at the named positions. Artwork position measured from two fixed edges.

Dimensions
Steel rule or calliper, bag empty and laid flat, at the named points
Mass
Scale, empty bag, recorded in grams against the reference unit
Foam thickness
Calliper, uncompressed, five named points on three panels
Stitch density
Count over the stated length at the named positions
Artwork position
Distance from two fixed edges, against the retained printed panel

Record the reading on every line rather than a tick. Five readings take an extra ten minutes and they are what let the next run be compared with this one, which is the difference between an inspection and a programme record.

Where a style has a welded or a moulded element, add a check for it rather than assuming the seam checks cover it. A weld fails differently from a seam, and the first sign is usually a change in the appearance of the weld line rather than an open seam.

What Are the Five Construction Checks?

Seam type matches the seam map. Reinforced points are present: handle attachment, strap anchors, base corners, zipper ends. Assembly sequence matches the specification. Handle attachment carries the specified stitch pattern. And the closure opens and closes through its full travel under a light load.

The last one is the only functional test on the sheet and it is worth doing on five units rather than one. A closure that works once and binds on the fourth try is a fastener problem that a single test will miss, and it is exactly the kind of problem a customer discovers in the first week of use rather than at goods-in.

Packing is the group most often dropped when time is short, and it is the group the customer sees first. A carton that arrives with the wrong marking, or with the units folded differently from the approved method, produces a complaint before anyone has looked at the bag.

What Are the Five Packing and Evidence Checks?

Carton size and marking match the packing specification. Folding and packing method match the approved one. Labels and barcodes are correct and legible. The required documents are packed or attached. And a retained unit has been taken and dated.

Packing check with carton marking and labels
The packing check: carton marking, folding, labels, documents, and the retained unit taken.

Set a time allowance and stick to it. An hour is realistic for twenty-five lines on one sample; a checklist that takes half a day is a checklist that gets filled in from memory at the end of the shift, which is the version that catches nothing.

Two further checks are worth adding to any list on a repeat programme, and neither appears in the five groups because they belong to the run rather than to the unit: that a first-piece sheet exists, and that a retained unit has been taken and dated before the cartons close.

How Is the Checklist Applied at Inspection?

On the inspection sample, at the comparison station, before the cartons are sealed, in one pass per group. The document checks happen first and before anything is opened; the material and measurement checks happen on the sample; the packing checks happen on the packed cartons.

One person should complete the sheet and another should sign it. Two signatures take a minute and they are what makes the sheet evidence rather than a note, in the same way they do on a first-piece sheet. Where only one person is available, the sheet should say so, because a single signature invites the question of who checked it.

One rule keeps the sheet honest: a fail is recorded whether or not it is acted on. A sheet where every line passes is either a very good run or a sheet that was filled in afterwards, and the reader usually knows which from the readings.

What Counts as a Fail on the Checklist?

A fail is a line outside its band, a registered item that is not the registered item, or a document that does not match. Three kinds, and each has a different response: a measurement is held and re-read, a material is a substitution and goes to the change log, and a document mismatch is corrected before shipping.

Six kinds of fail on the checklist, and what each one needs
Fail typeImmediate actionWho decidesRecorded where
A reading outside its bandHold the lot, re-read ten unitsBoth ownersThe comparison sheet
A substituted componentStop and raise a change noteBoth ownersThe change log and the register
A document mismatchCorrect before the cartons are sealedThe account ownerThe order and the file
A construction differenceHold and compare against the gold sampleBoth ownersThe comparison sheet
A packing differenceRepack, or accept with a noteThe buyerThe packing record
A missing retained unitTake one before the cartons closeThe inspectorThe run record

Photograph the sheet once and store the image with the run record. Paper goes missing, cupboards get moved, and a photograph of a completed sheet is enough to answer most questions that arrive a year later about what was actually checked.

How Is the Completed Checklist Filed?

With the comparison sheet, against the run number and the revision. One file per run, and the checklist is the index to it: a reader who opens the file sees the five groups, the readings and the conclusion on the first page.

Keep the completed sheets for the life of the style. A programme with four years of checklists can answer questions about its own history that no specification can, and it is the fastest way to see whether a problem is new or has been emerging for a while.

Keep the sheet to one page even if that means moving detail elsewhere. A checklist that runs to three pages stops being a checklist and becomes a document that somebody reads once at the start of the season and never opens again.

Review the sheet with the people who use it rather than for them. The inspector knows which lines are dead and which failure modes are missing, and that knowledge is almost never written down anywhere else.

What Should Be Dropped From the List?

Anything that has never once failed. A line that has passed on every run for three years is not controlling anything, and keeping it costs attention that belongs on the lines that do move. Review the list annually and cut what is dead.

Six lines worth keeping on any reorder checklist

  • The revision cited on the order, checked against the revision in force.
  • Body fabric compared against the retained panel under a named light source.
  • Foam thickness at named points, where the style carries padding.
  • Stitch density counted at the named positions rather than judged by eye.
  • Mass of the finished bag, which catches a material swap across several lines at once.
  • A retained unit taken and dated before the cartons are sealed.

Equally, add lines that have failed. A checklist is a record of what this programme gets wrong, and a line added after a failure is worth more than five inherited from a template that was written for a different product.

A last practical note: keep a blank copy of the sheet with the spec file, not in the inspector folder. The checklist belongs to the style rather than to the inspection, and it should travel with the revision it was written for.

What the sheet is for

Not to prove the bag is good. To make sure nothing that this programme actually gets wrong has been missed in the twenty minutes before the cartons close.

Completed checklist filed with the comparison sheet
The completed checklist, filed with the comparison sheet against the run number.

Ask us for the sheet

Send the checks you run today, or nothing if there is no list. We coordinate production with a comparison sheet and a retained unit per run, inspected at AQL 2.5 under ISO 2859-1 General Inspection Level II.

Frequently Asked Questions

What should be on a reorder checklist?

Twenty-five checks in five groups of five: documents, materials, measurements, construction, and packing with evidence. Each line carries a pass or fail column and, where it is measured, a reading column.

Why group the checks?

Because a reader who finds a fail in the materials group knows where to look next, and because five groups of five are easier to complete than twenty-five unrelated lines. Grouping also makes the sheet usable as an index to the run file.

What are the five document checks?

The revision cited on the order matches the revision in force; the component register is current; the change log covers every material or trim difference; the retained reference is the one for this revision; and the previous comparison sheet is to hand.

How should materials be checked?

By the method written on the tolerance table rather than by eye: shade by instrument with a gray scale fallback, foam by thickness at named points, hardware by code and by a fit check in the mating part. A material check by eye will pass a substitution.

What measurements belong on the list?

Dimensions at the named points, mass of the finished bag, foam thickness where the style has padding, stitch density at the named positions, and artwork position measured from two fixed edges - each with the method used.

Why record readings rather than ticks?

Because a tick records a conclusion and a reading records evidence. Five readings take an extra ten minutes and they are what let the next run be compared with this one, which turns an inspection into a programme record.

When should the checklist be applied?

On the inspection sample, at the comparison station, before the cartons are sealed: document checks first and before anything is opened, material and measurement checks on the sample, and packing checks on the packed cartons.

Who should sign the sheet?

One person completes it and another signs it. Two signatures take a minute and they are what makes the sheet evidence rather than a note, in the same way they do on a first-piece sheet.

What counts as a fail?

A reading outside its band, a registered item that is not the registered item, or a document that does not match. Each has a different response: hold and re-read, raise a change note, or correct before shipping.

How is the completed checklist filed?

With the comparison sheet, against the run number and the revision, one file per run. The checklist is the index: a reader opening the file sees the five groups, the readings and the conclusion on the first page.

What should be dropped from the list?

Anything that has never failed. A line that has passed on every run for three years is not controlling anything and costs attention that belongs on the lines that do move. Review annually and cut what is dead.

Should lines ever be added?

Yes, after a failure. A checklist is a record of what this programme actually gets wrong, and one line added after a real failure is worth more than five inherited from a template written for a different product.

People Also Ask

What should I check before a repeat order ships?

Twenty-five things in five groups: documents, materials, measurements, construction, and packing with evidence - applied on the inspection sample before the cartons are sealed, with readings rather than ticks.

How do you verify a repeat order matches the original?

Pull the inspection sample sized from ISO 2859-1, check the revision and register first, then compare materials, dimensions, mass, stitch density and artwork position against the retained reference and the tolerance table.

What is a reorder inspection checklist?

A one-sheet memory aid for the hour before the cartons close: five groups of five checks, each with a pass or fail column and a reading column, completed at the comparison station and filed against the run number.

How many things should a quality checklist include?

About twenty-five, grouped. Long enough to cover the failure modes that actually occur on a repeat and short enough to complete in an hour, reviewed annually so dead lines are cut and new failures are added.

What documents should I verify on a repeat order?

That the revision cited on the order matches the revision in force, the component register is current, the change log covers every difference, the retained reference is for this revision, and the previous comparison sheet is to hand.

Sources and further reading

Every figure on this page is either our own programme data or attributed below. Open the originals before you write them into a specification.