What Must a Bag Order Confirmation Put in the Specification?
Twelve fields turn a quotation into an obligation: the specification by revision, quantity by style and colourway, price and currency, both windows with their triggers, the payment split and its event, the inspection standard with the class list, the packing specification, the Incoterm with edition and place, the document set, the change rule, and the signatures.

An order confirmation is the document that turns a quotation into an obligation, and it needs twelve fields: the specification by revision, quantity by style and colourway, unit price and total, the sampling window with its trigger, the bulk window with its trigger, the payment split and its event, the inspection standard with the class list, the packing specification, the Incoterm with edition and place, the document set, the change rule, and the signatures. Missing fields become arguments later, usually at the invoice.
Programmes rarely fail at the dramatic moments. They fail quietly, at the point where two people remember the same conversation differently, and the order confirmation is the document that prevents that. A quotation is an offer; a confirmation is an agreement. The difference is not formality, it is that a confirmation is the thing a planner, an inspector and an accountant will each read, and each of them needs a different field from it. This piece sets out the twelve fields, why each one is there, and what to do when the confirmation disagrees with the quote.
What Is an Order Confirmation, and What Is It Not?
It is the written record of what was agreed, issued after the quotation is accepted and before production starts. It is not the quotation, and it is not the proforma invoice, though it frequently sits inside or alongside both. A quotation says what the seller will do for a price; a confirmation says what both parties have agreed will happen. Where the two disagree, the confirmation is normally the later and therefore the governing document, which is why it has to be read rather than filed.
It is also not a purchase order in the buyer sense, though a buyer purchase order can serve the function. What matters is that one document exists that both sides have seen and accepted, and that it carries the twelve fields. Where a buyer and a seller each hold a different document, each believing theirs is the agreement, the programme has no agreement at all — it has two documents and a future argument.
Which Twelve Fields Must Be in Writing?
Twelve, and the list is not arbitrary: each field corresponds to a person who will need it later. The planner needs the windows and the triggers. The inspector needs the standard and the class list. The accountant needs the price, the currency, the payment event and the charge treatment. Whoever receives the goods needs the packing specification and the document set. A confirmation with eight fields is a confirmation that will generate four questions.
| Field | Who needs it | What goes wrong without it |
|---|---|---|
| Specification, by revision and date | The inspector and the reorder | The run is judged against a recollection |
| Quantity by style and colourway | The planner and the accountant | A shortfall becomes an argument |
| Unit price and total, with currency | The accountant | Movement between quote and invoice is unchallengeable |
| Sampling window and its trigger | The planner | The buyer believes the clock started earlier |
| Bulk window and its trigger | The planner | A completion date cannot be calculated |
| Payment split and its event | The accountant | The release point is invented on the day |
| Inspection standard and class list | The inspector | A pass means whatever the reader wants |
| Packing specification | The warehouse and the forwarder | Carton cube and freight are discovered late |
| Incoterm, edition and place | The forwarder | Cost and risk transfer are argued |
| Document set | The customs entry and the accountant | A certificate is requested after shipment |
| Change rule | Everyone | A casual request becomes an expected absorption |
| Signatures and dates | Everyone | There is no evidence of agreement |
How Do You Reference the Specification?
By revision and date, and by attachment. "Built to specification revision 3, dated 12 April, attached" is a reference that can be checked. "As discussed" is not, and "as per the sample" is only as good as the sample being sealed, labelled and retained. The revision number matters because specifications change during sampling, and a confirmation issued after a change but referencing the pre-change revision is a confirmation for the wrong bag.
Where the specification is long, list the fields that matter most in the confirmation itself: the critical dimensions, the material references, the closure and the branding method. The long document is attached; the confirmation carries the fields a dispute would turn on. That duplication is deliberate, and it is the difference between a document that resolves a disagreement and one that has to be interpreted.
How Do You State Quantity and Tolerance?
Per style and per colourway, with a stated tolerance and a stated treatment of the difference. Production rarely lands exactly on the ordered number, and the tolerance clause decides whether a shortfall is a breach or a normal outcome. A tolerance of a small percentage, with the difference invoiced on the delivered figure, is the common arrangement and it is worth writing down rather than discovering.
One nuance that catches buyers: an over-run. Where a run finishes slightly over, the buyer is sometimes asked to take the extra units, and sometimes the extra units are shipped anyway. State which applies, and state who pays for them. Where the buyer has a warehouse constraint or a retail pack size, an over-run is not a bonus; it is a storage problem with an invoice attached.
How Do You State the Windows and Their Triggers?
As windows with named start events, and then as calendar dates where the start event has already happened. Sampling runs 6-10 working days from written sign-off of the tech pack; bulk runs 35-50 days from written sample approval. Both belong in the confirmation, and both should carry the trigger, because a window without a trigger is not a commitment. Where the sample is already approved at the point of confirmation, convert the window to dates.
Add the holiday question. A window quoted across a period when the line is closed contains days on which nothing moves, and naming them at confirmation stage prevents the conversation six weeks later. Where the buyer has a downstream commitment, state it, because a desk that knows the consequence can propose a plan rather than a hope.
What Must the Payment Clause Carry?
The instrument, the split, the event, the currency, the charge treatment and the beneficiary. On this programme the term is T/T 30/70 on FOB Xiamen, and the useful version of the clause ties the balance to a passed final random inspection at AQL 2.5 under ISO 2859-1 at General Inspection Level II, or to an agreed remediation. The clause should also say what happens when the balance is late, because production slots are planned in advance.
- Instrument
- T/T or documentary credit, named
- Split
- 30% on confirmation, 70% at the defined event
- Event
- What triggers the balance, named precisely
- Currency
- Stated, with who bears movement
- Charges
- Which side bears which bank charges
- Beneficiary
- Name, account, bank, matching the invoicing entity
What Must the Inspection Clause Carry?
The standard, the level, the class list, who books, who pays, and the consequence of a fail. Six fields, and the fifth and sixth are the ones most often omitted. A clause that says "inspected at AQL 2.5" without naming the level, the defect classes or the consequence is a clause that will be argued about at the release gate, which is precisely the moment the buyer has the least time to argue.
The class list deserves particular attention, because it is what turns a standard into a decision. Critical, major and minor defects need definitions in the context of the product: what counts as a critical on this bag, at what size a scratch becomes a major, and how many minors are tolerated. The inspection cluster sets out how that list is built in writing the inspection checklist into the RFQ, and it is worth reading once before the first order.

What Does the Document Set Need to Include?
The documents that will be needed at the customs entry and at goods receipt, listed now rather than requested later. The set varies by market and by end use, and naming it in the confirmation converts a future scramble into a scheduled deliverable. Where a document has to be issued by a third party, it also has a lead time, and that lead time belongs in the schedule rather than in the last week.
| Document | Needed for | When it has to exist |
|---|---|---|
| Commercial invoice | The customs entry and the payment | Before shipment, and checked before use |
| Packing list | Goods receipt and the customs entry | Before shipment |
| Transport document named by the Incoterm | Release and the customs entry | On shipment |
| Inspection report | The release decision and the balance | Before the balance is due |
| Material declaration for the market | The compliance file | Before sampling, because a substitution invalidates it |
| Any certificate the buyer sells on | The retail or marketplace requirement | Before the claim is printed |
What Does the Buyer Owe the Confirmation?
Three things that are rarely stated and that make the document work. The buyer owes a decision on the sample within a stated period, because the bulk window is calculated from written approval. The buyer owes the deposit on the date the confirmation states, because the slot was reserved against it. And the buyer owes a single named contact for approvals, because an approval that waits on an internal discussion is a delay the schedule cannot absorb.
Stating those three in the confirmation is unusual and it is effective. It makes the document reciprocal rather than one-sided, and it gives the buyer something to point at when an internal delay threatens the date. A confirmation that records only the seller obligations tends to be treated as a seller document, and it is then the seller who decides which of its clauses are live.
How Do You Handle Changes After Confirmation?
In writing, with the effect stated before the change is implemented. The rule that works is short: any change to the specification, quantity or schedule is agreed in writing, with the effect on price and on the completion date stated, before the change is made. That rule protects both sides, because it prevents a casual request becoming an expected absorption and prevents a desk from making a change the buyer did not ask for.
There is a category of change that is not the buyer choice: a material that becomes unavailable, a hardware item discontinued, a test requirement that changed. Those need the same treatment — written, with the effect stated — and they additionally need an approval right for the buyer, because a substitution is not an administrative detail. A substitution that changes performance invalidates any test run on the original material.
Who Signs, and What Makes a Signature Valid?
Someone with authority on each side, and the authority question is internal to each party. On the buyer side it is the person who can commit the money and accept the goods; on the other side it is the person who can commit the schedule and the price. A confirmation signed by someone without that authority is a document that will be disowned at the first difficulty, and the disowning is usually plausible.
A name, a role and a date are enough; a scanned signature is not required and adds nothing. What does add something is the acceptance being explicit: a reply that says "confirmed" against the document, rather than silence after it was sent. Where a buyer receives a confirmation and does not respond, the practical position is ambiguous, and ambiguity favours whoever drafted the document.
What Happens When the Confirmation and the Quotation Disagree?
Raise it immediately, in writing, and before any payment. A discrepancy found at confirmation stage is a correction; the same discrepancy found at invoice stage is a dispute. The common ones are the quantity, the Incoterm, the packing specification and the validity — and the packing specification is the sneakiest, because it rarely changes the total and therefore rarely gets noticed.
Twelve fields that turn an offer into an agreement
- Specification by revision and date, attached, with the critical fields restated.
- Quantity by style and colourway, with a tolerance and a treatment of the difference.
- Both windows with their triggers, and the holidays inside them named.
- The payment clause with instrument, split, event, currency, charges and beneficiary.
- The inspection clause with standard, level, class list, who books, who pays, and the fail consequence.

Should the Confirmation Cover One Order or the Whole Programme?
One order, with the programme described separately, and the distinction matters for reorders. A confirmation is a document about a quantity, a price and a set of dates, and those are specific to an order. A programme is a longer arrangement: the specification, the reference sample, the tooling, the colour standard and the reorder terms. Both are worth having, and conflating them is what produces the common problem of a reorder being quoted as though it were a first enquiry.
The practical form is a confirmation for the order and a short programme note beside it, recording the specification revision, the sealed reference sample, the tooling ownership and the reorder quantity position. The note is one page and it is the document that makes the second order a short conversation. Where a buyer runs several styles, the note is what turns a set of orders into a programme with a memory.
What Should the Buyer File With the Confirmation?
The quotation it confirms, the specification revision it references, the sample approval record, the proforma invoice, and the payment confirmation once it exists. Five documents and one folder, and that folder is what the programme runs on. Where a dispute arises later, the folder is the evidence; where a reorder is discussed, the folder is the brief; and where a colleague takes over, the folder is the handover.
Get the confirmation in twelve fields
Send the specification revision, the quantity split and the terms you need recorded. You get a confirmation carrying all twelve fields, with the triggers, the inspection clause and the change rule in writing.
Frequently Asked Questions
What is an order confirmation?
The written record of what was agreed, issued after the quotation is accepted and before production starts. It is what a planner, an inspector and an accountant each read.
How is it different from a quotation?
A quotation is an offer; a confirmation is an agreement. Where they disagree, the confirmation is normally the later and therefore governing document.
Which twelve fields must be in writing?
Specification by revision, quantity by style and colourway, price and currency, both windows with triggers, payment split and event, inspection standard and class list, packing specification, Incoterm with edition and place, document set, change rule, and signatures.
How should the specification be referenced?
By revision and date, attached, with the critical fields restated in the confirmation itself. "As discussed" is not a reference.
Should the confirmation state a quantity tolerance?
Yes, with a stated treatment of the difference. State also who takes an over-run and who pays for it.
How should the windows be written?
As windows with named trigger events: 6-10 working days from written sign-off for sampling, 35-50 days from written sample approval for bulk.
What must the payment clause carry?
Instrument, split, event, currency, charge treatment and beneficiary. On this programme, T/T 30/70 on FOB Xiamen.
What must the inspection clause carry?
The standard, the level, the defect class list, who books, who pays, and the consequence of a fail.
How are changes handled after confirmation?
In writing, with the effect on price and the completion date stated before the change is implemented. Substitutions need a buyer approval right.
Who should sign the confirmation?
Someone with authority on each side: who can commit the money and accept the goods, and who can commit the schedule and the price.
What if the confirmation disagrees with the quotation?
Raise it in writing before any payment. A discrepancy found at confirmation is a correction; the same discrepancy at invoice is a dispute.
What should be filed with the confirmation?
The quotation, the specification revision, the sample approval record, the proforma invoice and the payment confirmation, in one folder.
People Also Ask
What must be in writing on a bag order confirmation?
Twelve fields, including both windows with their triggers, the inspection class list, the packing specification and the change rule.
How is a confirmation different from a quotation?
A quotation is an offer and a confirmation is the agreement; where they disagree the later document normally governs.
How should quantity be stated on an order?
Per style and per colourway, with a tolerance and a stated treatment of any shortfall or over-run.
What should the inspection clause say?
Standard, level, defect class list, who books, who pays, and what happens on a fail.
How late is too late to query a confirmation?
Before any payment. A discrepancy found at confirmation is a correction; at invoice it is a dispute.
Sources and further reading
Every figure on this page is either our own programme data or attributed below. Open the originals before you write them into a specification.
- ICC — Incoterms 2020 rules and uniform customs and practice for documentary creditsInternational Chamber of Commerce
- ISO 2859-1:1999 — sampling procedures for inspection by attributesInternational Organization for Standardization
- ISO 9001 — quality management systemsInternational Organization for Standardization